The Park Rane Hospital, Chakradharpur, built by Rane Healthcare

Build a Hospital · by Rane Healthcare

From first survey to first patient.

Everything it takes to create a hospital or health infrastructure: planning and construction, equipment, licences and staffing, by one accountable team.

Under one roof

Everything a hospital needs, from one team.

We did not set out to do it all. Running hospitals in district towns left us no choice, and it made us a single, accountable partner.

01

Planning and construction

Feasibility, design, approvals and building, from an empty plot or shell to opening day. Hospitals, medical colleges and occupational health centres.

Setup packages and prices

02

Equipment and furniture

We trade and manufacture, so you do not pay a middleman's margin on top of a dealer's. Chosen before the walls go up, so the room is built around it.

Equipment and furniture

03

Licences and approvals

AERB, PCPNDT, fire NOC, biomedical waste, drug licence, Ayushman empanelment and NABH, filed and followed up until each one is issued.

Licensing and documentation

04

Staffing

A building does not treat patients. We find and place the doctors, super-specialists, RMOs, nurses, paramedical and non-medical staff a hospital needs.

Recruitment and staffing

How a hospital is built

A hospital is the hardest building a city ever asks for.

Oxygen in the walls. Filtered air in the theatres. A separate route for every patient, every trolley, every sterile tray. It has to work the day it opens, and through every power cut after that.

  1. 01 / 06

    Ground

    Survey, soil investigation and excavation, then a raft foundation engineered for heavy imaging equipment and decades of continuous load.

  2. 02 / 06

    Structure

    The clinical podium rises first. Floor heights and column grids are set by theatres, ducts and medical gas routes, not the other way round.

  3. 03 / 06

    Core and wards

    Lift cores climb ahead of the ward floors, with bed lifts and separate clean and soiled circulation fixed into the frame from day one.

  4. 04 / 06

    Envelope

    The facade closes the building against heat and dust, so that clean rooms, theatres and intensive care can be fitted out in controlled conditions.

  5. 05 / 06

    Systems and commissioning

    Medical gases, clean air, power backup, fire safety and nurse call are installed, tested and documented, department by department.

  6. 06 / 06

    First patient

    Inspections cleared, staff walked through, equipment validated. The lights come on and the building starts the work it was made for.

What we build

Every kind of care needs its own building.

Hospitals

  • Multispeciality
  • Superspeciality
  • Mother and child
  • Cancer
  • Eye
  • Trauma centre
  • AYUSH
  • Corporate

Medical education

  • Medical college
  • Nursing college
  • Pharmacy college
  • Paramedical college
  • Dental college
  • AYUSH college

Clinics and diagnostics

  • Polyclinic
  • Diagnostic centre
  • Pathology lab
  • Dialysis centre
  • IVF centre
  • Day-care surgery
  • Pharmacy
  • Blood bank

Care and industry

  • Occupational health centre
  • Rehabilitation centre
  • Senior care home

Launch and scale

Four reference models. Every price published.

From a polyclinic to a 100-bed hospital, each costed and built turnkey. Land and the civil shell are costed separately. Larger and specialist hospitals are built to your brief.

Compare all models
  • Polyclinic

    Starting

    ₹15–25 lakh

    2 beds · 2–3 months

  • 25-bed hospital

    Starting

    ₹1.26 crore

    25 beds · 4–6 months

  • 50-bed hospital

    Starting

    ₹2.5 crore

    50 beds · 6–9 months

  • 100-bed hospital

    Starting

    ₹6 crore

    100 beds · 9–12 months

Start a conversation

Tell us the town, the size and the timeline.

We will tell you honestly what it takes to open your hospital, and what it costs.