
Build a Hospital · Launch and scale
Any size. Any speciality. Priced in the open.
Start from one of our four costed reference models, or bring your own brief. From a 2-bed polyclinic to a medical college campus, we plan, build and launch it turnkey.
Reference models
Four proven starting points.
Every model covers planning, interiors, equipment, licensing support and launch. Land and the civil shell are costed separately, because your plot is not ours to price. Each one can be resized, re-specified or combined with another. They are benchmarks, not limits.
Model 01
Polyclinic
Starting
₹15–25 lakh
2 beds · 600 sq ft · 2+ specialties · 2–3 months
The smallest sensible way to start. Test your market, build referrals and add beds when the OPD numbers say so.
See the full modelModel 02 · Most requested
25-Bed Hospital
Starting
₹1.26 crore
25 beds · 5,500–6,000 sq ft · 4+ specialties · 4–6 months
Big enough for an ICU, an OT and round-the-clock emergency, small enough for one committed owner to watch every rupee.
See the full modelModel 03
50-Bed Hospital
Starting
₹2.5 crore
50 beds · 10,000–12,000 sq ft · 7+ specialties · 6–9 months
The step up for a proven catchment: a serious critical-care block and the bed count that keeps specialists on the roster.
See the full modelModel 04
100-Bed Hospital
Starting
₹6 crore
100 beds · 20,000–25,000 sq ft · 15+ specialties · 9–12 months
A district referral hospital: a 25-bed ICU, NICU, CT scan, blood bank storage and the scale Ayushman volumes reward.
See the full model
Side by side
Compare all four models.
| Polyclinic | 25-Bed Hospital | 50-Bed Hospital | 100-Bed Hospital | |
|---|---|---|---|---|
| Starting price | ₹15–25 lakh | ₹1.26 crore | ₹2.5 crore | ₹6 crore |
| Area (sq ft) | 600 | 5,500–6,000 | 10,000–12,000 | 20,000–25,000 |
| Beds | 2 | 25 | 50 | 100 |
| Specialties | 2+ | 4+ | 7+ | 15+ |
| ICU | — | 6 beds | 10 beds | 25 beds |
| HDU | — | 6 beds | 10 beds | 15 beds |
| NICU | — | 2 beds | 5 beds | 10 beds |
| Private & semi-private | — | — | 4 private + 2 semi-private rooms | Private and deluxe rooms |
| Emergency | — | 2 beds | Unit | 5 beds |
| Operation theatre | Procedure room | 1 | Theatres | Modular theatres |
| Imaging | — | X-ray, USG | X-ray, USG | CT, X-ray, USG |
| Laboratory | Sample collection | Pathology | Pathology | Full diagnostics |
| Pharmacy | Counter | In-house | In-house | In-house |
| Shell to opening | 2–3 months | 4–6 months | 6–9 months | 9–12 months |
How delivery runs
Six stages, survey to first patient.
01 / 06
Site & planning
Layout, department flow and the itemised inclusion list, before you commit a rupee.
02 / 06
Fit-out & interiors
Civil finishing, oxygen lines, power backup and every department built out.
03 / 06
Equipment
ICU, theatre, laboratory and imaging delivered, installed and commissioned.
04 / 06
Licences, in parallel
The licence clock runs alongside the fit-out, not after it.
05 / 06
People & training
Doctors, RMOs and nurses recruited and drilled before day one.
06 / 06
Opening day
A working hospital, not a building still waiting on six months of paperwork.
Start with a conversation
Planning something larger or more specialised?
Tell us the town, the size and the timeline. We will tell you honestly what it takes.
- Reply within one working day — usually faster
- Routes straight to the Founder's Desk, not a ticket queue
- Free and honest — if we're not the right fit, we'll say so