A hospital runs on power the way a body runs on oxygen — which is why the electrical inspectorate wants your installation certified before you switch on. DG sets, transformers, the works: above the notified thresholds, your installation needs clearance under the Central Electricity Authority's safety regulations.
It's a technical filing that lives or dies on drawings and test reports. We prepare it alongside your fit-out so the certificate arrives before the equipment that needs it.
You give us your electrical contractor's details and access to the installation.
We compile the technical file, coordinate the required tests, submit to the electrical inspectorate, host the inspection, and follow up until the certificate is issued.
With a competent electrical contractor and clean test reports, this is one of the quicker approvals. Problems come from undocumented installations — involve us before the wiring is buried, not after.
Start with a conversation
Send your details and we'll come back with the document list, the realistic timeline for your district, and what it costs.