If your factory’s medical arrangements were set up to satisfy the Factories Act, 1948, they were built on a law that is no longer in force. The Act stood repealed from 21 November 2025, when the Occupational Safety, Health and Working Conditions Code, 2020 took effect. The Central Rules under it were notified on 8 May 2026. Most plants have not yet revisited what they do about health on site.
This is a guide, not legal advice. Thresholds under the Code and its Rules are still being read differently by different advisers, and your state's rules may set their own. Confirm the figures that apply to your plant against the notified Rules and your state before you act.
What actually changed
The Code pulls thirteen older labour laws into one. For a plant, three consequences matter straight away:
- A new definition of a factory. The threshold rose to 20 workers where power is used and 40 where it is not. Some small units that were factories are not any more; others, counting contract labour properly, find they now are.
- Contract labour counts. The Code is far more explicit that the people on your site are your concern, whoever pays them. If your headcount was calculated on direct employees alone, calculate it again.
- One set of duties, one inspection regime. Safety, health, welfare and working conditions now sit in a single instrument with a single inspector-cum-facilitator, rather than scattered across several Acts.
Where occupational health sits now
The duty to look after the health of people on site has not gone away; it has moved and been restated. The Code and its Rules deal with medical facilities, health check-ups, the appointment of safety officers, safety committees and the welfare facilities that scale with headcount.
What is worth understanding is that the numbers are no longer where you remember them. Under the old Act, most managers could quote the worker count that triggered an occupational health centre, and the higher duty that applied to hazardous processes. Those figures sat in the Act and in state factory rules. They now have to be read out of the Code, the Central Rules of 2026 and your own state's rules, and the published commentary does not yet agree on all of them.
The practical answer is not to guess. Take your actual headcount, including contract labour, and your actual process hazards, to the current Rules and your state's rules, and get a written reading. That is a short exercise and it settles the question.
The argument that does not depend on the rules
Compliance is the reason most plants call us. It is rarely the reason that matters most.
In a serious injury, what decides the outcome is what happens in the first few minutes, and those minutes happen on your site, not at a hospital. A crush injury, a chemical splash, a fall from height, a cardiac event in a man of fifty on the night shift: in every one of them the gap between the incident and competent care is the whole game. A centre inside the gate closes that gap. A number in a register does not.
The second argument is quieter and bigger. Most of what shortens a worker's life in an Indian plant is not an accident. It is uncontrolled blood pressure, undetected diabetes, hearing loss that crept up over years, lung function nobody measured. A centre that runs periodic check-ups finds these while they are still cheap to treat, for the worker and for you.
What a working OHC needs
Whatever the threshold that applies to you, a centre that is actually useful has the same bones:
- A treatment room laid out so a stretcher can get in and out without turning
- Oxygen, suction, a defibrillator and emergency drugs, checked and in date
- An observation bed or two, so someone can be watched rather than sent away
- Rooms for periodic examinations: vision, audiometry, lung function, ECG
- A medical officer and nursing cover matched to your shift pattern, not just to day shift
- An ambulance, and a written, rehearsed route to the nearest hospital that can receive the case
- Records kept so that this year's audiogram can be compared with the last
The last point is the one most often missed. An occupational health centre that does not keep comparable records over years is a first-aid room with better furniture.
What we would suggest doing first
Before you plan a room, do three things. Count your real headcount, contract labour included. Write down your actual hazards, process by process. Then get a written reading of what the Code, the 2026 Rules and your state's rules require of a site like yours. Only then does it make sense to talk about equipment and floor plans.
That is the sequence we follow when we set up an OHC inside a plant, and it is why the plan we hand over tends to survive the first inspection.
We design, build, equip, staff and run occupational health centres inside industrial sites. If you want the reading done for your plant before you spend anything, ask us for a site visit.
Planning a hospital?
Tell us the town, the size and the timeline. We will tell you honestly what it takes.
